Installer: ASK Renewable Solutions
Date: 1st November 2024
Equipment Installed:
- 136 x Jinko 440w Solar Panels
- 1 x HANCHU 50kW C&I Three Phase Hybrid Inverter
- 3 x HANCHU 9.4kWh High Voltage Batteries
A three-phase battery storage system with a full PV array was installed on a commercial property in Wigan, with a storage capacity of 28.2kWh. Shifting to a renewable energy solution effectively saved the owners £4,375 just over 3 months, allowing for high energy independence & reduction in operating costs.