Installer: Think Free Solar Ltd

Date: 1st April 2025

Equipment Installed:

Think Free Solar Ltd installed a high-capacity solar and battery system for ESL Ltd in Hull. Using two HANCHU 50kW hybrid inverters and 188kWh of battery storage, the system now powers ESL’s steel fabrication facility – cutting monthly energy costs from £6,000 to zero while exporting surplus electricity to the grid.

Visit the Think Free Solar Ltd website here